2023 SLURRY SEAL PROJECT: Begins 4/28/23

Santa Clary Slurry Seal Project:  Commencing this week, 4/28/23

Morgan Pavement will begin the Slurry Seal process throughout Santa Clara City on 4/28/23 and continue through 5/10/23.  Dates provided are tentative and subject to change. Morgan Pavement will provide door-hangers 48-hours in advance to notify affected residents.  Click HERE to see a map of streets affected.  Streets are color-coded to show tentative dates asphalt maintenance will be taking place.  Click HERE to see the calendar and street names.

What is Slurry Seal?

Slurry is a laboratory designed mixture of asphalt emulsion, aggregate, mineral filler, water and other additives accurately proportioned, mixed, and uniformly spread over a properly prepared surface. Slurry is made in specially designed equipment, that carries a quantity of unmixed materials which are blended together in a continuous flow pugmill. The use of this technologically advanced machinery insures a smooth, consistently uniform mixture.

Why Use Slurry Seal?

Once applied, slurry forms a new durable and frictional weather resistant wear surface over the old pavement for maximum protection. The surface can be reopened to traffic within a few hours. Slurry seal is today’s choice in highly durable, cost effective, pavement maintenance. 

Previous Cadets take oath during POST graduation at UTECH

Leave Your Comment

Santa Clara City Offices
2603 Santa Clara Dr.
Santa Clara, UT, 84765

(435) 673-6712
Fax: (435) 628-7338
Santa Clara City Yard
3979 Santa Clara Drive
Santa Clara, UT 84765

(435) 656-4690
Fax: (435) 656-2076
Office Hours
Monday – Thursday: 8:00 am to 5:00 pm
Friday: 8:00 am to 1:00 pm
Closed Saturday & Sunday
Court Hours

Monday – Thursday: 8:00 am – 5:00 pm
Friday: 8:00 am – 10:00 am

Court Sessions:
1st & 3rd Tuesday:
9:00 am – 3:00 pm

Trials & Pre-trials:
2nd & 4th Tuesday:
4:00 pm

© Copyright - Santa Clara City (UT)